/// OFFICIAL OPERATOR
REF: ECA-INT-2026
Back to Strategic Sectors
/// ACTIVE RFP
Sector 04 · People's Republic of China → Kyrgyz Republic

Industrial Workforce Deployment42 Specialists Mandate

Official Commercial Proposal & Request for Partnership issued by Eurasian Consulting Agency (ECA). Recruitment, legal quota clearance, and full deployment logistics for 42 industrial production specialists to an automated fibre-cement sheet manufacturing plant in the Chuy Region, Kyrgyz Republic.

Total Headcount
42 Roles
3 Shifts Production
Facility Location
Chuy Region
Kyrgyz Republic
Contract Term
1 Year
Extendable Agreement
Operator License
REG: 1029384/KR
Min. Labour Clearance
Official Commercial Proposal Document (RFP)
Ref: ECA-RFP-CN-2026-042 · Complete legal specifications, conditions & agency proposal guidelines
Open Full Document
/// SECTION 01 — WORKFORCE REQUIREMENT

Production Positions & Headcount Allocation

Flat Fibre Sheet production operates on a continuous three-shift rotation. Candidates without prior experience will be considered with mandatory on-the-job training provided by the factory.

#Position / Production AreaHeadcountShift Structure
01Stacker operator — Flat Fibre Sheet line No. 333 shifts · 1 per shift
02Stacker operator — Flat Fibre Sheet line No. 433 shifts · 1 per shift
03Destacker operator — Flat Fibre Sheet line No. 333 shifts · 1 per shift
04Destacker operator — Flat Fibre Sheet line No. 433 shifts · 1 per shift
05Assistant destacker operator — Line No. 333 shifts · 1 per shift
06Assistant destacker operator — Line No. 433 shifts · 1 per shift
07Sheet loading / unloading operatives — Painting Section243 shifts · 8 operatives per shift
TOTALTotal Production Specialist Requirement423-Shift Industrial Operation

Stacker Operator

  • Operate automatic sheet-stacking equipment along lines No. 3 and No. 4
  • Monitor stacking accuracy, sheet count, and physical edge alignment
  • Ensure continuous line operation and promptly report mechanical anomalies

Destacker Operator

  • Operate equipment separating sheets and feeding them into technological line
  • Maintain strict adherence to automated manufacturing cycle speed
  • Prevent sheet edge chipping and monitor equipment condition during shift

Assistant Destacker Operator

  • Assist lead operators in servicing and feeding raw sheet material
  • Participate in equipment setup, line cleaning, and shift handover
  • Strict compliance with occupational safety and plant sanitation standards

Loading / Unloading Operatives (Painting Section)

  • Load sheets onto automated painting and curing conveyor lines
  • Unload finished painted sheets carefully to prevent surface scratches
  • Conduct visual quality control check and sorting into dispatch pallets
/// SECTION 02 — WORKING & LIVING CONDITIONS

Employer Provisions & Legal Safeguards

All candidates deploy under bilateral contracts authorized by the Ministry of Labour of the Kyrgyz Republic.

Free Dormitory Housing

Complimentary on-site accommodation in clean, heated dormitories directly adjacent to the manufacturing plant.

Canteen Meals Included

Hot nutritious lunches provided free of charge on all working shift days in the facility's certified canteen.

Full Legal Clearance

Official state work permits, visa facilitation, registration, and medical insurance organized by ECA under KR law.

Shift Schedule: 3 / 1

3 working days followed by 1 rest day. Standard 12-hour shift (07:00 – 19:00) with scheduled rest breaks.

Plant Transportation

Dedicated company shuttle transportation between dormitory complexes, meal facilities, and production halls.

On-The-Job Training

Comprehensive occupational health and safety (HSE) induction and technical line training provided on site.

/// PARTNERSHIP SUBMISSIONS

Submit Proposal for the 42 Specialists Mandate

ECA invites licensed Chinese recruitment agencies and workforce supply partners to review the proposal and submit their commercial terms.

Proposal Review Points:
  • ✓ Capacity to supply 42 workers across listed positions
  • ✓ Proposed wage expectations & agency service fee
  • ✓ Estimated timeline for candidate arrival in Kyrgyzstan
  • ✓ China-side documentation and mobilization procedure
Direct Partner Hotline (Bishkek HQ):
+996 5090 29 788 · +996 5042 99 990
info@eurasianconsultingagency.com
China Industrial Partner Inquiry